5-year construction warranty with Ponto Services!
Ventilation in renovation: from survey to commissioning
Published: 1 November 2026.
New windows, additional insulation and a different layout change how air enters and leaves a building. Ventilation therefore belongs in the design, quotation and renovation schedule. Coordinate capacity, ducts, air supply, extraction and controls. Only then can a well-chosen system work as intended.
Survey the existing building
Map the rooms, their current use and the existing air supply and extraction. Then record grilles, windows that open, vents, ducts and ventilation units. Also check which doors and ceilings you plan to replace. Photos and old drawings help. However, an on-site survey is still needed to understand the actual situation.
Assess what the renovation changes
Will windows be replaced or draughts sealed? Will there be a new bathroom, kitchen or building use? Each can change the existing airflow. Ask a building services specialist to assess the ventilation provision and capacity needed for the proposed design. The Dutch Building Works Decree has different rules for different building uses and existing buildings; one generic capacity does not fit every property.
Coordinate building services and finishes
A ventilation plan should align with the ceiling plan, service shafts, electrical work and any fire-resistant separations. Record where ducts run and how air enters and leaves the building. Also note which parts must remain accessible for inspection and maintenance. Discuss noise, controls and outdoor grille positions too. A late interior change can lead to extra work or a system that is difficult to access.
Make the quotation clear and checkable
Ask for a description of the selected system, the rooms it serves, the capacity assumptions and the works included in the price. Identify open decisions and any allowances separately. State who prepares the design, who makes the connections and what will be tested at handover. Changes to technical building systems can trigger additional requirements for sizing, commissioning and documentation; ask the installer to assess the specific works.
Check performance at handover
Allow time for balancing, checks and an explanation for the user. Ask for operating instructions, relevant measurement or balancing records, and maintenance information. Vents and filters must remain accessible after the renovation. This helps the owner assess operation and maintenance. It also makes outstanding points clear.
Continue with your renovation plan
Are you planning to insulate and change the layout at the same time? Read more about sustainable renovation and renovation with Ponto. Discuss your plans to identify the survey and specialist design work your property needs.
Sources, accessed on 1 November 2026: IPLO: ventilation in existing buildings; IPLO: technical building systems in renovationThis article provides general points to consider. The requirements for a specific property depend on its use, existing condition and planned works.