What is a contractor responsible for during a renovation?

Published: 29 October 2026.

For a major renovation, you expect the contractor to do more than schedule tradespeople. But what exactly are they responsible for? The answer starts with the contract: the contractor must carry out the agreed work, while design, permits and specialist investigations may be commissioned separately. Clear agreements prevent important tasks from falling between the parties.

The contract defines the scope of work

Record the result to be built and which drawings, calculations, materials and finishes form part of the appointment. Check whether demolition, foundations, building services, the kitchen, bespoke work and finishes are included. A contractor engaged only for the structural shell has a different scope from a company providing both design and complete construction. Also agree who the point of contact is and who may confirm decisions.

At Ponto, design and construction can be discussed within one plan, but the specific scope must always be set out in the quotation and contract. Also read our overview of who does what in a major renovation.

Preparing and coordinating the work

For the work within their scope, the contractor generally organises preparation, scheduling, material orders and coordination of the trades they engage. In a renovation or extension, the junction between old and new is important: the new structure, pipework, window frames and finishes must fit together. Ask who checks the construction drawings and when choices must be finalised.

If you engage another company yourself, for example for a kitchen or building services, record who will coordinate its work with the contractor’s work. Responsibilities do not become clear automatically just because everyone works on the same site.

The contractor also has a duty to warn

A contractor must give timely warning of errors or unsuitable items in the client’s instructions, drawings or materials that they know about or should reasonably recognise. Under the current rules, such a warning for building work must be clear, in writing and explain the possible consequences. Examples include a design detail that proves unbuildable or a defect in an existing structure that affects the work. This does not mean the contractor can automatically discover every hidden defect in advance.

Who arranges permits and structural calculations?

A design, structural calculation or permit application is not automatically included in every construction contract. Explicitly agree who handles the permit check and application , who prepares the drawings and who appoints the structural engineer . Even when Ponto can coordinate several elements, the exact division of responsibilities for the project must be clear. Do not start work while required approvals or information are still missing.

Safety and changes during construction

The work must be prepared and carried out safely. The necessary measures depend on the project: working at height, demolition, temporary support, access and the protection of occupants or neighbours may all need attention. Agree how the site will be organised and how communication will be handled during disruptive work.

Unexpected conditions sometimes come to light in existing buildings. First discuss the technical solution and its implications for the price and schedule. Confirm changes or additional work in writing before they are carried out, so that the original scope and additional work remain distinguishable.

Handover and information about the completed work

At handover, jointly check what has been completed and record outstanding items. Ask for the drawings, calculations, details of materials and building services, and maintenance information relevant to the project. For construction contracts entered into from 1 January 2024, the Dutch Civil Code includes rules on a consumer or handover dossier; parties may agree its contents. The documents to be supplied for a specific project should therefore be discussed during preparation.

If a defect emerges after handover, report it clearly and give the contractor an opportunity to assess the situation. Whether the contractor is responsible for a defect depends on its cause, the contract and the applicable rules. A general statement about liability or warranties cannot cover every project.

Questions to ask in advance

  • What exactly is included in the contract price, and what is excluded?
  • Who prepares the design, technical drawings and calculations?
  • Who handles permits and any required notifications?
  • Who manages subcontractors and external suppliers?
  • How will risks, deviations and additional work be reported and confirmed?
  • Which documents will you receive at handover?

A clear answer should ultimately appear in the project proposal and agreements, rather than only in a general conversation. See how we work or discuss your renovation with Ponto.

Sources consulted on 29 October 2026: IPLO on the contractor’s duty to warn; IPLO on the handover dossier; IPLO on the Dutch Building Quality Assurance Act. The agreements and applicable rules may differ from one project to another.